Abstract:The paper introduced a practical example of successful demolition of a 17-storey building in reinforced conrete shear wall structure by controlled blasting.Because of restricted surroundings,the muckpile must be controlled,which suggested a blasting program combining controlled blasting with collapsing in situ should be employed.In order to ensure the vertical collapse,complete disintegration and a minimized muckpile area,some technological measures such as preliminary demolition,drilling and charging in each floor were taken,and for diminishing blasting damage,down-hole second blasting and out-hole millisecond blasting were used to reduce charge quantity in single shot.The blasting reached very ideal result and verified the technologies designed in this project.