Development and Application of Integrated Management System for Casing Damage Well

王永东,徐国民,贺贵欣,李曦
DOI: https://doi.org/10.3321/j.issn:1000-0747.2002.03.027
IF: 5.194
2002-01-01
Petroleum Exploration and Development
Abstract:At present, there are over 1000 casing damage wells in Daqing oil field. Casing damage not only destroys seriously injection-production balance of oil field, but also restricts further adjustment of injection-production structure of oil field. In the paper, at first according to the casing damage features of Daqing oil field, casing damage conditions and production practice, we clarify the necessary and importance of developing an integrated management system for casing damage well. Then composition and function of integrated management system for casing damage well are introduced, and we describe in detail the mathematic model of economic evaluation which can optimize and combine big repair technical measure for casing damage wells. Taking Xingshugang oil field in Daqing oil field as example, using mudstone creep theory and Mesais rule, casing damage mechanism of Xingshugang oil field is determined. In the end, the popularization and application results of integrated management system for casing damage well are introduced. Successful development of integrated management system for casing damage wells provides a theoretical basis for engineering technical staffs to analyze the cause of formation for casing damage and work out an economic and reasonable integrated treatment project, improve work efficiency of casing damage well management, gain better economic and social benefits.
What problem does this paper attempt to address?