A 750 Kv Transmission Line Pilot Protection Suitable to Jiuquan Wind Power Base Delivery

Shi-en HE,Jia-le SUONAN,Cheng YANG,Shu-feng TAN,Zai-bin JIAO,Jing-de XIA,Li WANG
DOI: https://doi.org/10.3969/j.issn.1674-3415.2010.16.017
2010-01-01
Abstract:This paper presents a new pilot protection scheme based on fault component integrated impedance(FCII) for 750 kV transmission line with SC and TCR for Jiuquan wind power base.The FCII is the ratio of the sum of the fault component voltage phasor and the sum of the fault component current phasor of two terminals.It is used to identify if there is a fault on the line.If the fault is out of the line,the calculatio n value of FCII reflects the line capacitive impedance which has greater amplitude,and if the fault is on the line,it reflects the system impedance and line impedance which has relatively smaller amplitude.According to the amplitude of the FCII,the internal fault can be distinguished from external fault.Through compensating the capacity bet ween phases the reliability of the new scheme can be enhanced.The scheme can be set easily and has phase selection capacity,it is free from the influence of line load fluctuation,capacitive current,SC and TCR,and it can resist higher fault resistanc e.The effectiveness of the new scheme is verified by Jiuquan wind power 750 kV transmission system model and the new scheme is suitable to the large scale intermittent wind power delivery.
What problem does this paper attempt to address?