Research on Joint Generation Scheduling of Cascade Hydro Plants in the Dry Season

Mengfei Xie,Jianzhong Zhou,Wenyu Ouyang,Liu Yuan,Hairong Zhang
DOI: https://doi.org/10.2166/ws.2017.108
2017-01-01
Abstract:As more and more reservoirs are built, concentrated water releasing in the dry season will bring about additional flow compensation and the joint operation of cascade hydro plants is quite important. This paper discusses the water level decline strategy of four cascade hydro plants in the Jinsha River and analyses the relationship between guaranteed output and total power generation. Considering stochastic inflows, an implicit stochastic optimization method is employed and a multiobjective parallel differential evolution algorithm is proposed to extract dispatching rules. Finally, a method which combines discriminant method and dispatching rules is proposed for practical operations and achieves good performance. Compared with routine scheduling, the power generations of the proposed method are improved observably in different typical years. The average power generation increases about 3% with the same cascade minimum output.
What problem does this paper attempt to address?