Cost Plan Pattern Based on Bi-Standard for Large-Scale Intermittent Manufacturing

李向阳,徐晓飞,王颜新,张海龙
DOI: https://doi.org/10.3969/j.issn.1006-5911.2002.04.012
2002-01-01
Computer Integrated Manufacturing Systems
Abstract:Large-scale intermittent manufacturing has the production characteristics of designed-to-order products, project scheduling for client, one-of-a-kind or low volume etc.. In light of analysis on the essential conflict between the above-mentioned characteristics and the traditional cost plan methods, this paper provided a cost plan pattern on base of zero-base budget standard and working operation cost standard. For more, it brought forward working procedure of bi-standard, bi-direction working out, variance analyzing and implementation with regulation. Its system realization was discussed.
What problem does this paper attempt to address?