A Three-Stepped Cost Plan Method for Intermittent Manufacturing Enterprise

战德臣,聂兰顺,李向阳,徐晓飞
DOI: https://doi.org/10.3969/j.issn.1006-5911.2002.06.012
2002-01-01
Computer Integrated Manufacturing Systems
Abstract:The cost management of the intermittent product manufacturing enterpriseis very complex. After analysing the complexity of cost plan for the intermittent manufacturing enterprise, we bring on a three-stepped method for cost plan,which combines the traditional budget method through the top-to-down and bottom-to-up control policy, synthesizes the budgets to make decision by the way of task-relative computation and task-irrelative computation and builds the final cost plan. This method sovles the question of the complex cost management for intermittent manufacturing enterprise . In addition, we briefly introduce the software system developed to support this three-stepped cost plan method.
What problem does this paper attempt to address?