A Study on the Assistant Mechanical Time Quota

罗志清,王润孝,雷建,姜晓鹏,崔怡
DOI: https://doi.org/10.3969/j.issn.1001-3881.2004.12.022
2004-01-01
Abstract:For some problems in modern manufacture industr y, for example,it is difficult to provide accurate cost and schedule estimate for c urrent or future projects,and to estimate the assistant time in the process,the regression method was employed to analyze the assistant mechanical time quota an d to establish the quota standard.The standard can exactly and quickly estimate the assistant mechanical time of the manufacture process,which provides accurate and reliable data reference for the cost estimate,schedule and product pricing.
What problem does this paper attempt to address?