Probe into Determination of the Appropriate Time of Pavement Preventive Maintenance (PPM)

Dong Rui,Peng Yong
2004-01-01
Abstract:Critical element of an effective preventive maintenance (PM) program is to determine the appropriate time to conduct the certain treatment on the right pavement. Several methods could assist to determine when will be most effective to perform the pavement preventive maintenance (PPM). These methods include application of ride quality index or distress index (RQI or DI), condition based or time based PM, cost benefit evaluation, life cycle cost analysis (LCCA), decision trees or decision matrix, etc. By evaluation, the limitation of these methods was given. Based on the limitation of determination of appropriate time of PPM and the complexity of pavement destruction, the suggestion was made that the appropriate time of PPM should be based on multi criteria and pavement performances. The idea of pavement functional performance based PM was also given.
What problem does this paper attempt to address?