Comprehensive Measures of Steadily Operating Hydroturbine Generator Units in Wanjiazhai Yellow River

方源,温晓军,陈伟江,何成连,王正伟
DOI: https://doi.org/10.3969/j.issn.1005-6548.2004.02.010
2004-01-01
Abstract:By measuring analyzing the test data of hydroturbine generator in Wanjiazhai, it is found that the main cause of cracking the turbine vane is that the flaw is restricted by choosing different models of equipment. To ensure the stability of high water phrase in mixing flow hydroturbine, the viewpoint that thevane is above the maximum potential level is suggested. According to this the operation of hydroturbine is classified into 3 sections to guide the unit to run steadily decreasing the possibilities of cracking the wheels. By reinforcing the triangle block, testing the units, testing air-adding to the unit and testing blocking the crack of hydroturbine, a series of comprehensive measures is proposed about steadily operating the hydroturine units in Wanjiazhai. Some of the measures have be put into effect and the stability of the unit's operation is increased.
What problem does this paper attempt to address?