One Kinds of Matrix Describling to Integrate Progress Plan and Cost for Highway Projects

何寿奎
DOI: https://doi.org/10.3969/j.issn.1674-0696.2004.03.021
2004-01-01
Abstract:The text research to the integration of progress plan and cost data sets for highway projects, which bases the conflicts between them. Matrices are introduced to describle work breakdown structure and cost breakdown structure,and time-cost related matirix equations are presented to solve the interrelationships between their suface. We introduction the method and example to solve the problem in order to develop a project planning and cost control algorithm,and evaluates the scheduling economy using the matrix equations derived here.