A new approach of construction progress and quality control of RCC dam

段云岭,郑桂水
DOI: https://doi.org/10.3969/j.issn.0559-9342.2002.02.007
2002-01-01
Abstract:Because of the big concrete volume of the body of RCC dam and arch dam and its continuous construction, a set of strict temperature measures should be taken in the construction period But whether the temperature control measure is effective or not, there is no quick and effective assessment method and way that can be used in the actual construction at present Therefore, the construction progress and quality could not be controlled based on the actual conditions inside the dam body The distributed optical fiber temperature measuring system can rapidly measure a large amount of temperature information inside the concrete of dam body and then can check the effectiveness of the temperature control measures Therefore, we can use the temperature data, and the change speed and gradient of temperature inside the dam body to realize the real time control of the roller compaction lift speed of dam, the curing of dam surface and construction pouring surface, and the grouting treatment for those cold joints
What problem does this paper attempt to address?