Simulation and Optimization of Back Pressure Control for Circulating Fluidized Bed Boiler Unit with Unity of Three Towers

Zhang Li Xiang,Zhao Wei Bin,Jiao Yong Bin
DOI: https://doi.org/10.2991/icmmcce-15.2015.16
2015-01-01
Abstract:Unity of three towers (i.e. indirect air cooling tower, a desulfurizing tower and a chimney) technology with energy saving and environmental protection, saving water and electricity, high heat efficiency characteristics and a range of promotion and application in coal - fired power generation, and achieved good economic and social benefits. Research and improvement of three in one automatic control technology, to ensure the safety and stability of units to improve the thermal efficiency is particularly important. combined with the use of a certain power plant in Shanxi Province three towers and technical operation of the unit, working state by indirect air cooling system for the unit back pressure is analyzed, the application of fuzzy PI-Smith predictor integrated control strategy, on the back pressure turbine automatic control system simulation and optimization. The results show that the stability and robustness of the system better; the adaptability to load change has achieved good control effect.
What problem does this paper attempt to address?