Comparison of Mechanical Performances Between the Two-Stage Cutterhead and the Flat-Face Cutterhead for Rock Tunnel Boring Machine

geng qi,wei zhengying,meng hao,zhuo xingjian,jia lianhui,he fei,chu huali
DOI: https://doi.org/10.7652/xjtuxb201503019
2015-01-01
Abstract:In order to overcome the drawbacks that large cutting load and eccentric load on the TBM’s large diameter(>10 m)flat-face cutterhead that will cause excessive deformation of the cutterhead and damage of the main bearing,a two-stage cutterhead was introduced.The two-stage cutterhead was designed in grey relational analysis method based on the flat-face cutterhead applied in West Qinling tunnel project.The mechanical performance analysis models of the flat-face cutterhead and the two-stage cutterhead under the mixed-face rock ground condition were built to compare the cutterheads’ rock cutting thrusts and torques,as well as the eccentric forces and moments.And finite element models of the two cutterheads under uniform rock ground condition were built to compare the cutterheads’ deformation and stress distribution.The results show that the rock cutting thrust,the rock cutting torque,the eccentric force and moment,the deformation and maximum stress of the two-stage cutterhead are smaller than that of flat-face cutterhead,which illustrates that the rock cutting loads are distributed into two stages of the cutterhead,and at the same time,the stiffness of the cutterhead is increased and the stress concentration and eccentric load of the cutterhead were also decreased.
What problem does this paper attempt to address?