Integrated shortcut nitrogen and biological phosphorus removal from mainstream wastewater: process operation and modeling

Paul Roots,Fabrizio Sabba,Alex F. Rosenthal,Yubo Wang,Quan Yuan,Leiv Rieger,Fenghua Yang,Joseph A. Kozak,Heng Zhang,George F. Wells
DOI: https://doi.org/10.1039/c9ew00550a
2020-01-01
Environmental Science: Water Research and Technology
Abstract:Combined nitritation–denitritation and biological phosphorus removal from real wastewater was achieved for more than 400 days without chemical addition.
English Else
What problem does this paper attempt to address?