Research on Approach Bridge Design of Shenzhen University No. 1 Bridge

Li Yong,Zhu Chong-Li,Zha Xiao-Xiong,Shi Ming,Zhang Cheng
2015-01-01
Abstract:Shenzhen University No. 1 Bridge is located in the city center, it is the joint link between the north and the south campus. Based on the needs of the traffic and beautify the city, main girder of the approach bridge is the curve PC composite beams with corrugated steel web. The torsional problem of the current domestic maximum curvature PC composite beams with corrugated steel webs was solved and increases the lateral stability of bridges through double-limb curve corrugated steel web, horizontal wind bracing of concrete filled steel tube and other measures. It overcomes the problem that the traditional prestressed concrete box girder web plate is easy to crack. In the design, it takes into account the traffic function, and fully embodies the times tinge of modern bridges in the urban landscape. It provides new method and design data for engineering designs and engineering applications of curve or long-span PC composite beams with corrugated steel web.
What problem does this paper attempt to address?