Approximation algorithms for the single-machine scheduling with a period of maintenance

Ganggang Li,Xiwen Lu
DOI: https://doi.org/10.1007/s11590-015-0881-8
IF: 1.5288
2015-01-01
Optimization Letters
Abstract:We consider a single machine scheduling problem of minimizing total completion time subject to a period of maintenance, and design an O(nlogn) time algorithm with a tight performance ratio of 17/15 . Then, we study an integrated production and distribution problem, in which jobs are delivered by one vehicle to a customer after they are completed on a single machine with a period of maintenance. The objective is to minimize total delivery time of the jobs. We develop a 3/2 -approximation algorithm with O(n^3) time complexity.
What problem does this paper attempt to address?