Parallel machines scheduling with machine maintenance for minsum criteria

Zhiyi Tan,Yong Chen,An Zhang
DOI: https://doi.org/10.1016/j.ejor.2011.02.006
IF: 6.4
2011-01-01
European Journal of Operational Research
Abstract:This paper considers a parallel-machine scheduling problem with machine maintenance. There are unavailable periods on each of the first k machines, and the remaining m−k machines are always available, where 1⩽k⩽m is an integer. The objective is to minimize the total completion time of all jobs. We show the classical SPT algorithm has a worst-case ratio of at most 1+m-1m-k when k<m. If there is exactly one unavailable period on each of the first k machines, and the unavailable periods do not overlap, the worst-case ratio of SPT is at most 2+k-1m-1, and no polynomial time approximation algorithm with worst-case ratio less than mm-1 can exist when k=m unless P=NP.