Scheduling to Minimize the Maximum Total Completion Time Per Machine.

Long Wan,Zhihao Ding,Yunpeng Li,Qianqian Chen,Zhiyi Tan
DOI: https://doi.org/10.1016/j.ejor.2014.09.063
IF: 6.4
2015-01-01
European Journal of Operational Research
Abstract:In this paper, we study the problem of minimizing the maximum total completion time per machine on m parallel and identical machines. We prove that the problem is strongly NP-hard if m is a part of the input. When m is a given number, a pseudo-polynomial time dynamic programming is proposed. We also show that the worst-case ratio of SPT is at most 2.608 and at least 2.5366 when m is sufficiently large. We further present another algorithm which has a worst-case ratio of 2. (C) 2014 Elsevier B.V. All rights reserved.
What problem does this paper attempt to address?