Logic Design of Improved Backup Power Automatic Switching Considering the Influence of Small Hydropower Stations

Zhou Chenjie,Xiong Yi,Qin Liang,Zha Xiaoming
DOI: https://doi.org/10.4028/www.scientific.net/amr.463-464.1638
2012-01-01
Advanced Materials Research
Abstract:The correct and quick operation of backup power automatic switching (BPAS) devices is an effective guarantee of reliable power supply to the system. However, when transformer substations are connected to small-capacity distributed power like the local small hydropower stations, the conventional BPAS devices usually fail to get into operation, which leads to the loss of power in some parts of the system. To solve this shortage, this article comes up with an improved scheme of BPAS, which has been proved through PSCAD simulation to be effective in enhancing the stability and reliability of the power grid.