Practical and Theoretical Assessments of Subsea Installation Capacity for HYSY 201 Laybarge According to Recent Project Performances in South China Sea

facheng wang,yi xie,yong luo,bin li,jiannan li
DOI: https://doi.org/10.4043/25331-ms
2014-01-01
Abstract:Abstract As the first deep-water pipe-lay vessel in China, the recently launched Hai Yang Shi You (HYSY) 201 has been designed for up to 3, 000m water depth pipelay and other deepwater subsea equipment installation activities, with its advanced Dynamic Positioning (DP) 2/3 and 4, 000 tons lifting capacity. After the appearances in several projects in South China Sea (SCS), where water depths ranging from 300m to 1400m, the performance of HYSY 201 has been observed. The excellent project experience has been shared from four perspectives of pipe-lay, lifting, DP system and remote field development requiring multi-function constructions respectively. The performance of integrated pipe-lay and lifting acitivites in one project highlights the economic advantages of the vessel in remote filed developments. The as-built survey results have been employed to provide a quantitative investigation on the final project deliverables by HYSY 201. The theoretical evaluation of the subsea installation capacity limitation has been carried out by considering both the recorded practical operation data and equipments equipped by the vessel. Based on the analysis and study results, together from the field experience, the limitations of subsea installation capacity have been suggested for HYSY 201.
What problem does this paper attempt to address?