HYSY 201 Work Capacity Assessments on In-Line Manifold Installation
高爽,孟祥伟,孙友义,刘巍巍,汤珂,倪明晨,王军,王法承
DOI: https://doi.org/10.3969/j.issn.1001-3482.2016.05.001
2016-01-01
Abstract:In-line manifold installation means that manifold,PLET or in-line Tee is connected to pipeline on the fireline and then installed by stinger to seabed.Combined with characteristics of HYSY 201 ,within its geometry limitation,capacity limitation and strength capacity of pipeline, capacity assessment on in-line manifold installation is carried out,and then capacity envelope curve is generated about water depth,diameter of pipeline,wet weight and length of in-line mani-fold,provided reference for engineering practice.OrcaFlex software is adopted.Analysis procedure includes pure pipeline analysis,critical position screening analysis,detailed static analysis and re-sults post process.Based on given design basic data including water depth,diameter and wall thickness of pipeline,wet weight and length of in-line manifold,by referring to capacity envelope curve,the installation schemes of subsea manifold can be estimated.