Uncertainty Analysis and Application of Construction Diversion Tunnel Discharge Capacity

Wang Changhong,Wang Zhaoli
DOI: https://doi.org/10.2991/meic-14.2014.84
2014-01-01
Abstract:For the construction of the diversion tunnel discharge capacity problem, the difference of the starting point between the theory of uncertainty and the traditional deterministic theory is analyzed. The discharge capacity is affected by a comprehensive variety of factors, including the cross section area, roughness, wetted perimeter, Chezy coefficient and many other factors, and thus discharge capacity is multiple functions of these random variables. On the basis of the actual in-depth research and getting a lot of information, reasonable statistical analysis and properly determination of the distribution of various types of random variables are made. Establishing a reasonable probability density function and performance function, using Monte-Carlo method to simulate, the more objective and real discharge capacity reliability of the construction of the diversion tunnel can be accessed. Combined with practical engineering examples under the actual monitoring data for comparison, the results are objective and reasonable. The research results can provides a certain degree of programming reference for the same type for the future diversion project of the the same river basin.
What problem does this paper attempt to address?