Study on Method for Predicting Amount of Water Gushing in Tunnel

刘国华,陈银鲁,梁旭,王振宇
DOI: https://doi.org/10.3969/j.issn.1000-0860.2009.07.010
2009-01-01
Abstract:Based on the basic principles of 6 calculation methods for predicting amount of water gushing in tunnel,the calculation approaches,formulae and suitable conditions are discussed.The predicting water gushing with appropriate calculation method is helpful to make both the early warning and the construction countermeasure concerned.Taking a water diversion project in Hangzhou as a case,the amount of water gushing in the section with the stake number from 6+331 to 6+360 is predicted with water-balance method and groundwater dynamics method,and the amount of water gushing in the section with the stake number from 1+885 to 1+905 is predicted with hydrogeologic analogy method as well.Through the comparison with the actual measured amount,it is demonstrated that the error of the predicting value is less,and then provides a better technical support for the smooth implementation of the project.The study shows that all the 6 predicting methods have their own advantages and shortcomings;and then better predicting effect can be obtained,only if they are applied under their suitable conditions.
What problem does this paper attempt to address?