Numerical analysis of different ventilation schemes during the construction process of inclined tunnel groups at the Changheba Hydropower Station, China

Shuai Shao,Xing-guo Yang,Jia-wen Zhou
DOI: https://doi.org/10.1016/j.tust.2016.07.007
IF: 6.9
2016-10-01
Tunnelling and Underground Space Technology
Abstract:During the excavation process of underground caverns, the rational selection of the ventilation scheme is very important for the safety and health of construction workers. The flood discharge tunnel groups at the Changheba Hydropower Station are selected as a case to study the design of ventilation schemes in inclined tunnel groups; these groups are characterized by a gradient of approximately 10% and a complex intersecting relationship among the tunnels. The Computational Fluid Dynamics (CFD) method is used to simulate the fluid dynamics in tunnel groups when different ventilation schemes are employed. Four ventilation schemes with the same duct at different positions along the transverse section are formulated, and the scheme approaching the right side with most of the construction adits is adopted in engineering after a comparative analysis, as it offers a well-distributed velocity field and sufficient security distance. The study reveals that flow vortices appear in the tunnels with a long axis length ranging from 5m to 20m; the observation that the flow velocity on the transverse sections is away from the heading face indicates that a low-velocity area is always present in the vicinity of an air duct, and the security distance on the upstream side is 60% shorter than on the downstream side with the same air-blower when the tunnels have a 10% gradient. In addition, when the excavation distance rises 200m, the ventilation condition in the tunnels, especially in the areas around tunnel intersections, is greatly improved by the completion of pilot tunnels and shafts in advance.
construction & building technology,engineering, civil
What problem does this paper attempt to address?