Chapter 5 - Installation and Vessels

yong bai,qiang bai
DOI: https://doi.org/10.1016/B978-1-85617-689-7.10005-6
2010-01-01
Abstract:The objective of this chapter is to provide a basic understanding of the installation concepts and vessel requirements for subsea engineering. The topics covered in this chapter are: typical installation vessels; vessel requirements and selection; installation positioning; and installation analysis. Subsea structures are normally transported from onshore to the offshore installation site by a transportation barge. Once at the offshore installation site, the subsea structure is transferred from the transportation barge to the drilling rig or construction vessels. Drilling vessels are mainly designed for drilling activities, but they are also used for the Subsea Production System (SPS) installation because of their installation capacities such as water range, lifting capacity, and positioning capacity. Installation of subsea hardware requires the vessel to keep its position well so that the subsea hardware can be placed onto the target foundation with the required accuracy. Two methods are widely used for subsea hardware installation: the guideline (GL) method and the guideline-less (GLL) method. Installation analysis is a type of calculation for the validation of lifting capacity, strength capacity for lifting objects and vessel structures, etc. Installation analysis can be divided into two categories based on different phases of installation engineering: preliminary installation analysis of the front-end engineering design (FEED) for determining the installation method, installation vessels and equipment, as well as the relevant installation duration and cost estimations, and detailed installation analysis of the engineering design with the goal of developing and installation procedure and relevant installation drawings.
What problem does this paper attempt to address?