The Status of Nsrl Beamline Construction

QP Wang,XJ Yu,YW Zhang,CY Xu,JY Shi,CX Li,YC Tian,YL Hong,HJ Zhou,XY He,TN He,F Wang,YG Tang,LS Sheng,ZP Liu
DOI: https://doi.org/10.1063/1.1757841
2004-01-01
Abstract:There are 8 beamlines and experimental stations tinder construction at NSRL. Two of these bean-dines are ready for users. Others are installed at the storage ring and expected to be in operation by the end of this year. This paper will briefly describe these beamlines' optical system, the quality control of optical components, mechanism calibration and alignment of critical parts.
What problem does this paper attempt to address?