Industrial Applications of Three-phase T/R for Upgrading ESP Performance

zhang binwei,wang ronghua,yan keping
DOI: https://doi.org/10.1007/978-3-540-89251-9_53
2009-01-01
Abstract:This paper reports one of our recent ESP upgrading activities. It was performed with a 600 MW coal fired boiler equipped with a four-channels and four-fields ESP. The dust collection efficiency was around 98.69% and the emission was in the range of 200 mg/m3–300 mg/m3. The upgrading include replacing the four traditional single-phase T/Rs used for inlet fields with four three-phase ones. The new HV system has been in operation for over one year. Dust emission keeps to be below 200 mg/m3 with more than 400 kW energy saving.
What problem does this paper attempt to address?