A study on system connection schemes for ±1100 kV UHVDC sending and receiving ends
Yating WANG,Yichi ZHANG,Xiaojiang GUO,Chen SHEN,Huanghuang QIAO,Qinyong ZHOU,Yilang JIANG,Ding MA
DOI: https://doi.org/10.13335/j.1000-3673.pst.2016.07.001
2016-01-01
Abstract:System connection schemes of sending and receiving ends in the first ±1100 kV UHVDC project (Zhundong-Wannan) are analyzed in this paper. Firstly, for sending end, considering influence of DC recovery and DC blocking fault on power grids, feasibility of two connection modes (isolated and grid-connected operating modes) is discussed from perspective of frequency/voltage stability with DC security and stability calculation specification. Then for receiving end, from aspects of increasing multi-infeed short circuit ratio (MISCR), reducing short-circuit current and balancing power flow distribution, feasibility of 500kV single-layer connection, 1000 kV single-layer connection and 1000kV/500kV double-layer connection are studied respectively. Lastly, from perspective of grid topology of converter station connection and options for transmission channel in receiving end, etc, connection scheme of converter station is presented.