Beam instrumentation system for shanghai soft x-ray fel test facility*
L. W. Lai,L. Y. Yu,Y. B. Leng,R. X. Yuan,J. Chen,Y. B. Yan,W. M. Zhou,S. S. Cao,L. H. Hua,B. Gao,N. Zhang,T. Shen,F. Z. Chen,R. T. Jiang,W. C. Fang,C. Feng,SSRF
2020-01-01
Abstract:Shanghai Soft-Xray FEL (SXFEL) test facility was designed and built to demonstrate EEHG and HGHG schemes and verify key technologies for the future hard xray FEL facility (SHINE). After three years commissioning 8.8 nm FEL radiation with peak power of 1 MW had been achieved at the end of 2019. The design, fabrication, commissioning and operation of BI system including striplineBPM, Cavity-BPM, screen monitor, bunch length monitor, beam arrival monitor, bunch energy monitor, will be introduced in this paper. Several lessons learned during design stage and beam commissioning stage, such as radiation damage of CCDs and step-motors, bad choice of CBPM working frequency, thermal drift of BAM and so on, will be addressed as well. INTRODUCTION SXFEL Test Facility (SXFEL-TF) was initiated in 2006 and founded in 2014. Its 0.84GeV linac and undulators were installed through 2016 to 2018, it is for testing the cascaded seeding schemes. The main parameters are listed in Table 1. The SXFEL-TF commissioning has completed this year, and the SXFEL user facility (SXFEL-UF) is under construction. The layout of SXFEL-TF and SXFEL-UF are shown in Figure 1. Table 1: SXFEL-TF Parameters Parameter Value Total length 293m Electron energy 0.84 GeV Bunch charge 0.5 nC Repetition rate 10 Hz FEL output 8.8 nm FEL scheme HGHG/EEHG FEL pulse 100-200 fs FEL power >100 MW Figure 1: Layout of SXFEL-TF (top) and SXFEL-UF (bottom). In order to maintain high FEL gain, high performance beam instrumentation system is required for the SXFELTF. Measured beam parameters including bunch charge, beam position (BPM), beam profile, beam arrival time (BAM) and bunch length (BLM). Table 2 lists the beam diagnostic devices included and the required resolution. Table 2: Requirements of SXFEL-TF Diagnostic System