Identical Parallel Machines Scheduling with Sequence-dependent Setup Times

Dayong Hu,Zhenqiang Yao
DOI: https://doi.org/10.3901/jme.2011.16.160
2011-01-01
Journal of Mechanical Engineering
Abstract:This paper discusses the parallel machines scheduling problem with the objective of minimizing the maximum completion time. Sequence-dependent setup times are considered. The scheduling problem is formulated as a mixed integer programming model. This is a NP-hard problem, and then a genetic algorithm is developed to obtain near optimal solutions. A lower bound is introduced to evaluate the quality of the solution obtained from the proposed genetic algorithm. Computational experiments are conducted, and the results show that the proposed genetic algorithm can provide reasonable solution within an acceptable computational time.
What problem does this paper attempt to address?