A case study on the application of critical chain scheduling in duration risk control of a new product development

Hong Qing Li,Li Lu
2010-01-01
Abstract:The purpose of this paper is to explore the critical chain scheduling in risk control of project duration in new product development area. Based on simulation method, the study proposed a new project buffer sizing approach which include the following steps: First assume the duration distribution of activities, then simulate the duration, statistical simulation results, compress safety time, identify the resources and set buffers. The case study witnessed the effects of the proposed approach.
What problem does this paper attempt to address?