Physical Model Testing On Earth Pressure Balance Shield Machine Tunnelling In Sand Strata

Q. W. Xu,X. R. Ge,H. H. Zhu,Y. B. Fu,X. S. Wu
2010-01-01
Abstract:A series of model tests were carried out to study the tunnelling-induced ground disturbance by combining with shield machine working parameters. The experiment adopted a newly developed 400 mm diameter Earth Pressure Balance (EPB) shield machine to simulate the shield tunnelling process in sand strata. The model ground was prepared by the sand raining method to get a relative uniform density and the model shield machine advanced at the preset jack advance speed and screw rotation speed. During the tunnelling process, the data about transverse and longitudinal ground settlements, earth pressure, pore water pressure, chamber pressure, mucking efficiency, thrust force, and cutting torque, etc., were measured simultaneously. Through the analysis of the test results, the relationship between working parameters and ground disturbance, as well as the inter-relationship between working parameters, such as chamber pressure and mucking efficiency, jack thrust force and cutting torque, etc., were revealed.
What problem does this paper attempt to address?