ECONOMIC ANALYSIS OF BIOMASS GASIFICATION AND POWER GENERATION PROJECTS

Chuangzhi Wu,Zhaoqiu Zhou,Longlong Ma,Xiuli Yin,Hanping Chen
DOI: https://doi.org/10.3321/j.issn:0254-0096.2009.03.018
2009-01-01
Abstract:The economic efficiencies of two projects on biomass gasification and power generation, with capacity of 2 MW and 6 MW, were analyzed. Under present economic environment, the equipment investment of biomass gasification and power generation project is about 5000-6500 Yuan/kW, and the investment recovery period can be from 6 to 8 years as the electricity price to power grid about 0.6-0.65 Yuan/kWh. Although investment cost of the 6 MW project is higher than that of the 2 MW, its technical and economic indices are better than the latter due to adoption of more advanced technology and high system efficiency. Generating cost, investment recovery period and internal rate of return are very sensitive to biomass price and tax rate, which are two key factors that influence the economical efficiency of biomass gasification and power generation plant. The increase of biomass price and tax rate will reduce economical efficiency of the projects, showing the increase of generating cost, the prolongation of investment recovery period and the decrease of internal rate of return.
What problem does this paper attempt to address?