Summary of commissioning test on the 1000 kV UHV AC demonstration project

Xiaogang Wang,Yonghua Yin,Liangeng Ban,Hongguang Zhao,Bin Zheng,Bin Han,Jianjun Zhang,Dong Ge,Xiaotong Wang,Zexin Zhou,Yuanyuan Zhang
2009-01-01
Abstract:The 1000 kV UHV AC demonstration project developed by State Grid Corporation of China(SGCC) is the first UHV project in the country. The successful construction of this project is of great significance to the reliability of China's electric power supply, and to the research and application of UHV transmission technology around the world. This paper has introduced the overview of the commissioning test, including research and determination of commisioning plan, testing results, and the evaluation of main equipments. © 2009 Chin. Soc. for Elec. Eng.
What problem does this paper attempt to address?