Model and Algorithm for Integrated Steel Making Charge Plan

董红宇,黄敏,王兴伟,郑秉霖
2009-01-01
Abstract:For the demand of integrated production in steel industry, the charge plan and the integrated technical constraints were described firstly; Secondly, a multi-objective integrated charge plan model was introduced in detail based on flexible customer requirement; to solve this model, a two-phase heuristic algorithm was introduced, at the first phase, a grouping strategy based on the rules was proposed; at the second phase, a probability match algorithm was proposed. Finally, the analysis results of real production data, which are solved by two-phase heuristic algorithm and manual planning, show that the model and algorithm are feasible.
What problem does this paper attempt to address?