Model And Algorithm For Integrated Charge Plan In The Steel Industry

Hongyu Dong,Min Huang,Xingwei Wang,Binglin Zheng
DOI: https://doi.org/10.1109/WCICA.2008.4593573
2008-01-01
Abstract:According to the demand of integrated production and the characteristic of charge plan in the steel industry, firstly, use graph theory to describe charge plan; Secondly, a bi-objective charge plan model is introduced in detail considering weight range, flow limitation and other factors; To solve this model, a two-phase heuristic algorithm(THA) is introduced, which deals with the simple graph with vertex clustering method firstly, and then design a novel probability match algorithm to solve the optimization model; Finally, the simulation with large-scale production data shows that the model and algorithm is feasible.
What problem does this paper attempt to address?