IN-SITU TEST ON CONSTRUCTION EFFECT WITH FREEZING METHOD FOR FAULT-CROSSING FRAGMENTATION ZONE IN METRO TUNNEL

雷军,白明洲,许兆义,张爱军,霍玉华,王鹏程
DOI: https://doi.org/10.3321/j.issn:1000-6915.2008.07.025
2008-01-01
Abstract:When crossing the Qingquanjie fault fragmentation zone in Guangzhou metro tunnelt,he application of freezing method to construction of the connected aisle for metro project is introduced.During the constructiont,he stress and deformation of supporting structure,tunnel deformation constringency,ground displacement,stress of surrounding rock,stress of steel grille,the deformation of the ground surface in the course of freeze and thaw are tested.On the base of testing result,the stress and deformation of structure and environment soil are put forward studied.The laws of the survey results are examined.Finally,based on these studies,some suggestions are for guiding the construction about the freezing method and construction.The results can be used for reference of similar projects.
What problem does this paper attempt to address?