Alumina Recovery from Red Mud with High Iron by Sintering Process

ZHOU Qiu-sheng,FAN Kuang-sheng,LI Xiao-bin,PENG Zhi-hong,LIU Gui-hua
2008-01-01
Journal of Central South University
Abstract:By employing the thermodynamic database of alumina production,relevant chemical reactions involved in the sintering process of red mud furnace charge with high iron were analyzed.Based on the thermodynamic analyses,influences of factors,such as sintering temperature,sintering duration time and prescription of red mud furnace charge on the sintering process were investigated.The results show that addition amount of calcium oxide can vary in a wide range,possible formation of indissoluble compound salts thermodynamically results in the decline of alumina recovery in the sinter,which prolongs sintering duration time and increases calculated sodium ferrite(Na2O.Fe2O3) mass fraction in the sintering process of red mud with high iron.The optimized prescription of red mud furnace charge with high iron and its suitable technological condition are as follows: the mass fraction of calculated sodium ferrite in sinter is 10%-12%,molar ratio of calcium oxide to ferric oxide is 1.0-1.2,sintering temperature is 1 000-1 050 ℃,and sintering duration time is 30-40 min.Under the optimal prescription of furnace charge and sintering technological conditions,alumina recovery can reach 85%-90% when mass fraction of alumina in sintering is 15%.
What problem does this paper attempt to address?