Research on the Half-Opened Feedback Controller of the Cascaded Hydropower Plants

樊红刚,朱渊岳,陈乃祥,权学林
DOI: https://doi.org/10.3969/j.issn.1003-1243.2007.06.024
2007-01-01
Abstract:Some cascaded hydropower plants connected with open channel and pipe have not enough storage capacity comparing with the discharge,so it is difficult to adjust each unit independently.The state space model of the whole cooperation governing systems of the cascaded hydroelectric power stations is built in which a new state feedback controller is proposed by using optimization method and reduced dimensions method.This controller can not only adjust the speed(load) but also balance against the discharge.The simulation result shows that the cascaded hydropower plants could run stably with this dimensionality reduction feedback controller.Moreover,this governor can be realized easily since the number of the feedback states is reduced.
What problem does this paper attempt to address?