Operating Stability of Half-Opened Cascaded Hydropower Stations with Double-Pid Governors

Chen Naixiang
2010-01-01
Abstract:A double-PID tuning model was used to achieve stable operation of half-opened cascaded hydro electric power stations,connected by open channels and pipes.The combined control of the power station system stabilizes the speed and water level between stations to achieve the steady operation.The model was applied to a two-step cascaded station with Francis turbines connected by open channels and pipes.The simulations show that the double-PID governor can control the generator speeds and the inter-station water level.