Width-changeable Beam Search Algorithm for Fuzzy Project Scheduling

Xu CHENG,Cheng WU
DOI: https://doi.org/10.3969/j.issn.1000-8152.2007.04.022
2007-01-01
Abstract:Project scheduling with flexible constraints and ill-known processing time is a practical but hard problem. In traditional Beam Search(BS)algorithms,constant beam-width could influence the quality of solution.A model of this category of scheduling problem is formulated in this paper.By combining traditional BS algorithm and OO(ordinal optimization)theory,a width-changeable BS algorithm,which balances the quality of solution with computing time,is presented.Experimental results show that this algorithm can obtain satisfactory solution in acceptable time and be applied to practical fuzzy projects.
What problem does this paper attempt to address?