The Commission of Hefei Light Source after Reconstruction

HL Xu,L Wang,BG Sun,L Shang,GF Liu,WM Li,ZP Liu,DH He
DOI: https://doi.org/10.1109/pac.2005.1591685
2005-01-01
Abstract::Hefei light source was updated. Both the kicker system and RF system were reconstructed completely, and commissioned well. Two methods were used to suppresse transverse coupling instability. After the effect of SCW is compensated, beam life was increased. The global closed orbit is realized firstly in Hefei electron storage ring.
What problem does this paper attempt to address?