Concurrent Design and Construction Model of Nuclear Power Plants

李林,郭吉林,刘井泉
DOI: https://doi.org/10.3321/j.issn:1000-0054.2003.06.029
2003-01-01
Abstract:The most common problems in the construction of nuclear power plants are inefficient communications and ineffective coordination among participants, which result in many design modifications, installation rebuilding, and delays which all increase costs. This paper describes the application of concurrent engineering methodology to the design and construction of nuclear power plants. A concurrent design and construction model was developed for nuclear power plants and the concurrent design framework was analyzed in detail. Five aspects of the model were the support environment, the overall knowledge base, the integrated design and construction technology and tools, the design process, and the organization mode. The concurrent design and construction model for nuclear power plants can improve engineering quality, shorten construction lead times and reduce construction costs. 
What problem does this paper attempt to address?