Multilevel Hierarchical Production Planning Architecture for Engineer-to-order Enterprises

李小平,徐晓飞,战德臣
DOI: https://doi.org/10.3969/j.issn.1005-9113.2002.03.007
2002-01-01
Abstract:The critical materials and critical parts are keys to the production at Engineer-to-Order (ETO) enter-prises implies that the control of plans for critical materials and critical parts is essential to the control of allplans at ETO enterprises. A mixed mode of hierarchical network planning/MRP (NP/MRP) is proposed to gen-erate network plans for critical materials or critical parts from project networks and the plans for non-criticalparts produced by MRP are constrained by the related project networks. The multilevel hierarchical networkplanning/MRP mixed planning (MHNM) architecture proposed is the extension of the hierarchical NP/MRP tothe supply chain based on the temporal constraints of multilevel project networks for critical materials or criticalparts. A general model is formulated for scheduling tasks on machines at work centers as well.
What problem does this paper attempt to address?