Satisfactory scheduling for semiconductor manufacturing line based on multi-object

王中杰,吴启迪,有杰
DOI: https://doi.org/10.3321/j.issn:1001-0920.2002.06.006
2002-01-01
Abstract:The objects for optimization are selected by analyzing the performance targets of the manufacturing line. Aiming at the defects of the scheduling policies based on single-object, a policy of satisfactory scheduling based on multi-object is proposed by introducing the concept of satisfaction and employing fuzzy rules and comparative law. Experiments prove that this policy has more advantages than that based on single-object, which provides a way of performing overall optimization of the manufacturing line.
What problem does this paper attempt to address?