STUDY ON GLOBAL MEASUREMENT OF TRANSIENT POWER ANGLE AND DYNAMIC SIMULATING EXPERIMENT

钟志安,程林,孙元章,彭疆南,崔沅,张剑云,黎雄
DOI: https://doi.org/10.3321/j.issn:1000-1026.2002.16.012
2002-01-01
Abstract:In order to meet the demand of real-time global monitoring and control of the power system by the real-time control and analysis system, this paper builds the real-time control and analysis system's hardware platform with decentralized sampling and centralized control based on the technology of phase measurement with GPS. It presents the idea of real-time sampling of all the relative power angles of any two generators in the system to realize the global stability control. The system uses the phasor measurement unit (PMU) to get the phasor of each generator, and sends these phasors to the server through the high-speed communication network to get the relative power angles in the global electrical network. Validating the real-time capability of the system through the dynamic simulating experiment, which indicates that the time for data sampling, transmission and analysis in LAN is less than 20 ms, and the total time of calculation including calculating the influence of real network condition and long-distance transmission is about 30 ms-50 ms.
What problem does this paper attempt to address?