Probability estimation of total construction cost for hydropower project with fuzzy estimation of subconstruction cost

Xiaoyang Tang,GuangTing Liu,Zhiming Wu
1996-01-01
Abstract:Estimation of construction cost is an important link in the earlier stage of the hydropower engineering. It is influenced by a lot of uncertainty factors with the randomness. The construction cost is decomposed into several subconstruction costs according to the decomposability of system. The fuzzy estimation model of subconstruction cost is established by employing the near-degree theory in fuzzy mathematics. Based on the subjective estimation method, the value of expectation and variance of several subconstruction were determined. Then, the expected value and variance of total construction cost of hydropower engineering were deduced by using theory of multivariate stochastic variable and the relation curve was defined between cost and probability. This estimation method objectively reflects the realistic change characteristic of the construction cost.
What problem does this paper attempt to address?