A study on the mathematical estimation model of contingency reserve for investments in hydro-electric engineering project

Cai HangQing,Qiang Maoshan
DOI: https://doi.org/10.3321/j.issn:1000-131X.2006.07.020
2006-01-01
Abstract:The concept of contingency reserve is introduced to respond to the risks involved in the investment of hydro-electric projects. The key issue herein is how to estimate the quantity of the reserve. In order to enhance the estimate ability, a new model on the basis of modern risk management method is proposed and developed in this paper. In this model, two kinds of risk variables are defined, namely, they are subjective and objective variables. The reserve is calculated by using the formula defined in the model which involves all the variables. Three techniques are employed to estimate the probability distribution function of these variables. The gray forecasting technique and the ARMA model are discussed in some details. The proposed model can help investor to manage the key risks on a project, thus reduce its cost variations.
What problem does this paper attempt to address?