Research on random-fuzzy estimation method of construction cost

Xiaoyang Tang,Zhiming Wu,GuangTing Liu
1996-01-01
Abstract:Total construction cost is decomposed into costs of several sub-constructions according to the decomposability of a system. Then, with the near-degree concept in fuzzy mathematics, the sub-construction cost is estimated on the basis of the similarity between built and undetermined sub-projects. Finally, the most probable cost of total construction is composed of the costs of several subconstructions. Based on expert experiences and actualities, three characteristic values of the total cost are determined (minimum value, most probable cost and maximum value). Considering the randomness and fuzziness, the statistics method for the random-fuzzy probabilistic numerical characteristics is set up and the random-fuzzy estimating method of the project cost is put forward.