Research on Washing Strategy Optimization Model of Combined Cycle Gas Turbines

CHENG Yuan,CHEN Jianhong,SHENG Deren,LI Wei
DOI: https://doi.org/10.13334/j.0258-8013.pcsee.2013.26.016
2013-01-01
Abstract:At present, crank washing criteria about gas turbines are mostly established according to compressors of clean-fuel-fired gas turbines and pay little attention to the washing cost. Based on the principle of minimum mean generalized crank washing cost in the whole crank washing interval, a novel optimization model about economical crank washing interval of heavy-oil-fired gas turbine combined cycle (GTCC) power plants was proposed. The generalized crank washing cost of a GTCC power plant mainly includes running additional cost and shutdown cost. The calculation result of a GTCC power plant indicates that the optimal crank washing interval is approximately 77 hours. Compared with traditional washing criteria (48 h), the optimization model mentioned above improved the availability of equipment and profited more 5.94 million Yuan per year. Compared with the actual interval (150 h) being executed by the power plant, the optimization model improved operation security and profited more 12.34 million Yuan per year. Finally, effects of fuel price, market electricity price, shutdown time, degradation rate and washing number on optimal crank washing interval were studied also. The result shows that the optimal crank washing interval is greatly influenced by above factors except washing number.
What problem does this paper attempt to address?