An algorithm of production scheduling for pulling production systems with resource constraints

Wei Yu,Yumin Ma,Fei Qiao
DOI: https://doi.org/10.1007/978-3-642-38445-5_40
2013-01-01
Abstract:For the production scheduling of bottleneck of pulling production systems with resource constraints, a time-margin-based heuristic algorithm (TMBHA) is proposed to realize the optimization of facility utilization and intermediate inventory based on discrete-event simulation. Compared with manual scheduling and genetic algorithm (GA), the result shows TMBHA is effective in the aspect of efficiency and computation time. © Springer-Verlag Berlin Heidelberg 2013.
What problem does this paper attempt to address?